Fiber-optic TELCO lines, moisture detection and alarm systems with biometric scanning, 24 hour monitoring and humidity control systems were employed. Emergency backup power includes a remote 125 kva generator, backed with battery (uniterrupted power system) with closed transition paralleling switches. All work was completed within 6 months, on schedule.
